Tiger
Member
Registered: 12th Jun 01
Location: Leicestershire Drives:Astra VXR
User status: Offline
|
I've got a HAL104 pat tester as I'm building a production line at work, some of the portable units are greater than 13A but the HAL103 is on a 13A plug top. I could do with getting earth leakage results which means a full run test but shall I just make do with Earth Bond and IR? Not sure what the requirements are for supplying leakage results in the documentation.
|
baza31
Member
Registered: 19th Apr 03
Location: yorkshire
User status: Offline
|
cant you use a 16a adaptor ? if load is over 13a earth bond / continuity, if under Load / Leakage & touch Current tests iirc . What you testing?
|
Tiger
Member
Registered: 12th Jun 01
Location: Leicestershire Drives:Astra VXR
User status: Offline
|
All different types of hot / cold food counters that we manufacture.
|
Tiger
Member
Registered: 12th Jun 01
Location: Leicestershire Drives:Astra VXR
User status: Offline
|
I'm testing items that are up to 32A, Both single and three phase. I know I can use a single phase adapter but I have no idea how that will work for a load / leakage test.
|
baza31
Member
Registered: 19th Apr 03
Location: yorkshire
User status: Offline
|
If its over 13a load don't think you need to iirc. Ill find out tomorrow, can't you split load down I.e elements , doing gantry etc? I'd just do that and write how you did it on notes.
|
Tiger
Member
Registered: 12th Jun 01
Location: Leicestershire Drives:Astra VXR
User status: Offline
|
That's my other option yeah, it's a 3 phase chassis with different single phase equipment in various chassis to make up a full restaurant counter. I wanted to test the chassis complete though but thinking about I could test the chassis as one unit and the items within as individual items.
|