Kitchen and bathroom floors ready for tiling. Have my 200x200mm black tiles ready to go down, but leaving that until the bathroom ceiling is plastered. Had artex painted orange (like the bathroom ) and it was split so no way of repairing. Used the guy that did my brothers house to plaster. Only charged me £65. Boarded it with my dad the other week.
Bathroom tiled -
Bathroom ceiling boarded -
Bathroom ceiling plastered -
Once I've painted the ceiling can put the last row of tiles on the walls and finally be rid of that horrendous colour.
Got a bit of a project on the go for the stairs too.
|
Robbo
Member
Registered: 6th Aug 02
Location: London
User status: Offline
|
how much longer til you can move in do you think?
bedroom, bathroom and kitchen all nearly done so should be soon right?
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Floor tiles ready to down in kitchen and bathroom. Have a back UPVC door and 2 UPVC windows to fit (upstairs already has UPVC) then the fire place needs rebuilding followed by the walls skimming and painting.
As for the stairs - I'm getting some ply cut at work and over cladding the original stairs then carpeting it.
Then it will be ready
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Bathroom ready for bath. Tiling walls finished and ceiling and light fitted.
Fitted new UPVC back door today -
As for the old render, I won't be getting it re done and I don't think I can get back to brick so might cover it in snowcem.
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Bathoom tiled and ready for bath fitting -
New dining room window fitted today -
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Just got a stone window sill and 2 cast iron fireplaces for £50
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
All need some work obviously, but for £50 they were a bargain.
Fireplace for living room -
Needs new tiles either side as these were broke so didn't get them.
Fireplace for back bedroom -
and where it is going -
Stone windowsill for living room window -
Paint needs stripping off and taking back to bare stone. Cut off end will be hidden in wall.
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Yesterdays work -
Trial fitted the back bedroom fireplace. Thinking of changing the bit where the handle is to black.
Started tiling the kitchen floor. Couldn't do it all yesterday as we ran out of spacers and needed access to the yard!
Paint stripper applied to the stone sill. Going to take a few goes I think as the blue has gone to reveal white paint below. Also applied to the hard wood door up to the loft which has also been painted blue and is white underneath!
Lastly, my dad decided to expose the plaster around the fire place to see how high the bodge job of filling in bricks went. The brick has has a metal lintel and they have filled in below it. Can see the original opening is quite wide. Thinking of leaving the arch exposed but as I am fitted the cast iron fireplace there with a wooden surround it might not work.
|
deano87
Member
Registered: 21st Oct 06
Location: Bedfordshire Drives: Ford Fiesta
User status: Offline
|
Exactly what we have done with our fireplace in the lounge. We aren't having a surround though and intend on fitting a log burner!
Ours also has the steel lintel on the arch which dad said was temporary but they always left them on.
Removal of our back filling created so much dust!
|
deano87
Member
Registered: 21st Oct 06
Location: Bedfordshire Drives: Ford Fiesta
User status: Offline
|
On the tablet so difficult to post the actual pick but this is our fireplace as it stands tonight. Just now need to mist coat, paint and sort the wood out.
http://instagram.com/p/pmfbrpREeX/
|
Robbo
Member
Registered: 6th Aug 02
Location: London
User status: Offline
|
quote: Originally posted by deano87
On the tablet so difficult to post the actual pick but this is our fireplace as it stands tonight. Just now need to mist coat, paint and sort the wood out.
http://instagram.com/p/pmfbrpREeX/
looks great, good work!
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
quote: Originally posted by deano87
On the tablet so difficult to post the actual pick but this is our fireplace as it stands tonight. Just now need to mist coat, paint and sort the wood out.
http://instagram.com/p/pmfbrpREeX/
Nice, mine seems a lot higher than yours though?
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Had the day off and tiled the kitchen floor -
|
Haimsey
Premium Member
Registered: 8th May 05
Location: Nottingham Drives: Corsa B
User status: Offline
|
Looks good. What colour grout will you be using?
Marcy Marc
White Sport Progress Thread
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Probably dark grey or charcoal.
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Floor grouted -
Door to loft -
From -
To -
|
Pop
Member
Registered: 8th May 03
Location: Reading
User status: Offline
|
The floor tiling looks great, you've done a good job there.
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Got these last night for the bathroom -
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Tomorrows job -
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
New sill and window in.
Before -
Sill -
After -
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Bought and cut to size window sills for inside living and dining rooms. Bought some panels for side of bath. Like this -
http://www.ratedpeople.com/image/1/4/5/3/9/3/6/profile/gallery/1357642843108_profile-gallery-image.jpg
Brushed screed on to floor of bathroom in preparation for tiling the floor. Using it to cover up the bitumen that was under the old vinyl tiles.
Which then leaves the mosaic tiles for back porch. Only they are order only from Portugal and could take a month to get here
|
Robbo
Member
Registered: 6th Aug 02
Location: London
User status: Offline
|
updates? have you bloody moved in yet?!
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Bathroom floor tiled and new bath fitted. Had a bit of a faff with the plumbing so that took longer than expected. Plus needed to gouge some plaster out of the wall to make the bath fit. Got some wood to clad the side of the bath, thatjust needs painting once I find some suitable paint. Got my tiles for back lobby on order. Black and red in 100m squares. They are coming from Portugal so waiting 4 weeks for them.
Work were supposed to be cutting me some wood to clad my stairs but doesn't look like that is happening now so need to sort my own.
Next need to get fireplace in living room rebuilt then get the living room and dining room replastered. Then can paint.
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
Bathroom floor tiled -
Bath in -
Bath was siliconed after picture was taken. Got the panels cut to size and they will be painted and stuck on to the plywood. Sink should be back in on Sunday.
|
Marc
Member
Registered: 11th Aug 02
Location: York
User status: Offline
|
|