We're hoping to be moved in, in the next month... or end of April at the latest. Just waiting for the wooden floor guy to pull his finger out and tell us the concretes dry enough to fit it (concretes been down since May last year and apparently still a bit damp). then we need carpets fitted, all being well first week in April they are booked in for.
But whilst we're waiting the en suite bathroom needs bringing forward. So today I've (with the help of the old boy) started to 'box in' where the sink/toilet will go
and while we're at it raise the shower tray area by 7" so it has a proper fall on the waste pipe. This will add a nice feature........ when more LED light go in
the boxing in will be finished tomorrow, then next weekend it'll be sorting out the U/F heating and tiling..... again
just can't wait now till its all done.
|
mattk
Member
Registered: 27th Feb 06
Location: St. Helens
User status: Offline
|
Nice job, what shower will you be using?
|
neoquip
Member
Registered: 12th Aug 02
Location: Nottm
User status: Offline
|
plumbers sorting the shower out, its the same as the one we have now at the flat.
ts main pressure feed. OK if you have decent pressure
|
mattk
Member
Registered: 27th Feb 06
Location: St. Helens
User status: Offline
|
so is it just an electric one, or is it one with an external pump? and a mixer valve?
[Edited on 15-03-2008 by mattk]
|
neoquip
Member
Registered: 12th Aug 02
Location: Nottm
User status: Offline
|
mixer valve.
got an eletric Mire Sport + in the normal bathroom... just in case of any problems as a back up etc
|
mattk
Member
Registered: 27th Feb 06
Location: St. Helens
User status: Offline
|
ahh rite, if your using an external pump use one with Bronze impellers, we whent through 3 with plastic ones, this one has been in for 3 yrs now,
I always reccomend Bronze impeller ones now
|
CorsAsh
Member
Registered: 19th Apr 02
Location: Munich
User status: Offline
|
All these lights youre fitting, are they easy to swap out when one fails?
|
AndyKent
Member
Registered: 3rd Sep 05
User status: Offline
|
Concrete is still damp after 10 months
Bullshit, concrete is fine after 30 days at most.
|
mattk
Member
Registered: 27th Feb 06
Location: St. Helens
User status: Offline
|
and get a propper stone tray!
|
neoquip
Member
Registered: 12th Aug 02
Location: Nottm
User status: Offline
|
quote: Originally posted by aPk
Concrete is still damp after 10 months
Bullshit, concrete is fine after 30 days at most.
not when it's almost a foot thick.
yep... stone tray already to go in.. on a 5:1 mix of cement
|
AndyKent
Member
Registered: 3rd Sep 05
User status: Offline
|
Nah, concrete will be absolutely fine. You could pour it 3 feet thick and it'd be pretty much fine after 30 days.
We recommend at work that reinforced concrete for access tracks shouldn't be driven on for 30 days by normal vehicles, 60 for artic lorries and thats generally 200-300mm thick.
Yours should be absolutely fine mate.
|
Daimo B
Member
Registered: 20th Mar 00
User status: Offline
|
We poured our concerete for our garage, in the rain (then covered it over).
It was fine within a month..... During which we bdone the other parts of the garden, garage walls etc....
|
C2RL R
Member
Registered: 28th Mar 02
Location: Redcliffe, QLD
User status: Offline
|
pretty sure you dont need to cover it over. i think concrete actualy sets quicker if its under water.
|
neoquip
Member
Registered: 12th Aug 02
Location: Nottm
User status: Offline
|
well he wouldn't lay the real OAK wooden floor till the % of moisure was down to 11%... we were running at 16% in someparts and 23% on others.